Active Capital Projects
42
+6this quarter
Capital Budget (Active)
$310M
67%deployed
Infrastructure Grade
C+
+0.2vs 2024
Assets at Risk
23
+5new flags
Infrastructure Health Scores
Asset condition index (0–100)
Roads72/100
Water81/100
Sewer68/100
Bridges76/100
Stormwater64/100
Capital Projects Status
Major projects — budget & progress
| Project | Budget | Spent | Status | Risk | Target |
|---|---|---|---|---|---|
| Riverwalk Flood Mitigation Ph.2 | $48M | $12M | Environmental Assessment | HIGH | 2028-Q4 |
| Queen St BRT Infrastructure | $32M | $24M | Construction — 75% | LOW | 2026-Q3 |
| Bovaird Dr Widening (Mississauga Rd–Chinguacousy) | $28M | $18M | Construction — 65% | MEDIUM | 2026-Q4 |
| Downtown Brampton Streetscape | $15M | $3M | Design Phase | LOW | 2027-Q2 |
| Water Treatment Plant Expansion | $85M | $22M | Procurement | MEDIUM | 2029-Q1 |
| Sandalwood Pkwy Extension | $42M | $8M | Detailed Design | LOW | 2028-Q2 |
| Community Centre — Heritage Heights | $38M | $5M | Site Preparation | LOW | 2027-Q4 |
| Stormwater Mgmt — Etobicoke Creek | $22M | $14M | Construction — 60% | HIGH | 2026-Q2 |
Aging Infrastructure Alerts
Assets requiring immediate attention or near-term replacement
Etobicoke Creek Culvert #14
Age: 52 years • Condition: Poor • Est. Replacement: $4.2M
Centre St Water Main (Main–Church)
Age: 48 years • Condition: Fair-Poor • Est. Replacement: $2.8M
Nelson St Bridge
Age: 44 years • Condition: Fair • Est. Replacement: $6.5M
West Trunk Sanitary Sewer
Age: 40 years • Condition: Fair-Poor • Est. Replacement: $8.1M
McMurchy Ave Storm Sewer
Age: 55 years • Condition: Poor • Est. Replacement: $3.4M
Water System Capacity
Current demand vs. capacity
78%
of total capacity utilized
Current: 312 ML/dayCapacity: 400 ML/day
Expansion needed by 2028 at current growth
Wastewater Capacity
G.E. Chicken WWTP + West Trunk
84%
of total capacity utilized
Current: 336 ML/dayCapacity: 400 ML/day
Critical — expansion required by 2027
Road Network Congestion
Average travel time index — AM Peak
1.42
Travel Time Index (1.0 = free flow)
Steeles Ave1.68
Queen St1.52
Bovaird Dr1.45
Main St N1.38
Airport Rd1.21