Infrastructure Monitor

Live

Infrastructure Monitor

Capital projects, asset health & capacity management — City of Brampton

Active Capital Projects
42
+6this quarter
Capital Budget (Active)
$310M
67%deployed
Infrastructure Grade
C+
+0.2vs 2024
Assets at Risk
23
+5new flags

Infrastructure Health Scores

Asset condition index (0–100)

Roads72/100
Water81/100
Sewer68/100
Bridges76/100
Stormwater64/100

Capital Projects Status

Major projects — budget & progress

ProjectBudgetSpentStatusRiskTarget
Riverwalk Flood Mitigation Ph.2$48M$12MEnvironmental AssessmentHIGH2028-Q4
Queen St BRT Infrastructure$32M$24MConstruction — 75%LOW2026-Q3
Bovaird Dr Widening (Mississauga Rd–Chinguacousy)$28M$18MConstruction — 65%MEDIUM2026-Q4
Downtown Brampton Streetscape$15M$3MDesign PhaseLOW2027-Q2
Water Treatment Plant Expansion$85M$22MProcurementMEDIUM2029-Q1
Sandalwood Pkwy Extension$42M$8MDetailed DesignLOW2028-Q2
Community Centre — Heritage Heights$38M$5MSite PreparationLOW2027-Q4
Stormwater Mgmt — Etobicoke Creek$22M$14MConstruction — 60%HIGH2026-Q2

Aging Infrastructure Alerts

Assets requiring immediate attention or near-term replacement

Etobicoke Creek Culvert #14
Age: 52 years • Condition: Poor • Est. Replacement: $4.2M
Immediate
Centre St Water Main (Main–Church)
Age: 48 years • Condition: Fair-Poor • Est. Replacement: $2.8M
Within 2 years
Nelson St Bridge
Age: 44 years • Condition: Fair • Est. Replacement: $6.5M
Within 5 years
West Trunk Sanitary Sewer
Age: 40 years • Condition: Fair-Poor • Est. Replacement: $8.1M
Within 3 years
McMurchy Ave Storm Sewer
Age: 55 years • Condition: Poor • Est. Replacement: $3.4M
Immediate

Water System Capacity

Current demand vs. capacity

78%
of total capacity utilized
Current: 312 ML/dayCapacity: 400 ML/day
Expansion needed by 2028 at current growth

Wastewater Capacity

G.E. Chicken WWTP + West Trunk

84%
of total capacity utilized
Current: 336 ML/dayCapacity: 400 ML/day
Critical — expansion required by 2027

Road Network Congestion

Average travel time index — AM Peak

1.42
Travel Time Index (1.0 = free flow)
Steeles Ave1.68
Queen St1.52
Bovaird Dr1.45
Main St N1.38
Airport Rd1.21